Square D™ EZ Meter-Pak™ EZM11200GCBUMS Main Circuit Breaker Meter Center Main Unit, 120/240 VAC, 1200 A, 1 ph Phase, NEMA 3R Enclosure
Meter Mains
PDW~12315394
MFG #: EZM11200GCBUMS
Square D™
0.00000
/ ea
Square D™ EZ Meter-Pak™ Meter Center Main Unit, Main Circuit Breaker, 120/240 VAC, 1200 A, 1 ph, Underground Feed, (4) 3/0 AWG to 500 kcmil Wire, Wall Mounting, NEMA 3R Enclosure, 23.7 in W x 13.62 in D x 65.31 in H Dimensions
- Computer~Aided [CAD|BIM] Model URL - files?p_enDocType=CAD&p_File_Name=PWFDS-SYRS-0109.dwf(Computer~Aided [CAD|BIM] Model URL)
- Computer~Aided [CAD|BIM] Model URL - files?p_enDocType=CAD&p_File_Name=PWFDS-SYRS-0109.dwg(Computer~Aided [CAD|BIM] Model URL)
- Seller Home Page URL - us(Seller Home Page URL)
- Spec Sheet URL(Spec Sheet URL)
- Spec Sheet URL - 11003_31QPEUDIAM7ZH6TS.pdf(Spec Sheet URL)
- Tech Drawing URL - 11003_4DYU6K35ORBPCMZL.zip(Tech Drawing URL)
- Tech Drawing URL - files?p_enDocType=Technical Drawing&p_File_Name=PWFDS-SYRS-0109.dxf(Tech Drawing URL)
- Tech Drawing URL - files?p_enDocType=Technical+Drawing&p_File_Name=PWFDS-SYRS-0109.dwg(Tech Drawing URL)
- Applications
- Features
Indoor/Outdoor Applications |
VISI-TITE™ nut and bolt make installation faster and easier by eliminating the need for special tools or time-consuming torque readings |
Circuit breaker, fusible switch and terminal box mains from 400 to 1600 A maximum |
Suitable for use as service equipment |
Unique field phase-balancing allows easy on-site changing of phase-balancing |
External mounting channels permits immediate installation with no disassembly or adjustment required |
Mounting brackets swing out of the way, allowing mounting holes to be drilled without moving the device |
Top and bottom wiring gutters allow branch circuits to exit from the top, bottom or back of the unit |
Single, double and three position meter-breaker units can be connected in any combination, providing a solution for any size application |
When installed, main terminal boxes do not protrude past adjacent meter center, complying with EUSERC's required spacing around installed meters |